Planning a demolition? Asbestos must be removed first.
Demolishing a building without first identifying and removing asbestos is illegal in virtually every jurisdiction. Demolition generates enormous volumes of dust and debris, and any asbestos present will be released into the environment, contaminating the site and surrounding areas.
A refurbishment and demolition survey (Type 3 / invasive survey) is required before any demolition work. This involves destructive inspection to access hidden materials behind walls, above ceilings, and below floors.
All identified asbestos must be removed by licensed contractors before demolition begins. The demolition permit typically requires proof that asbestos has been cleared from the site.
The Problem
Military buildings, barracks, hangars, munitions stores, and command centres, were built to rigorous fireproofing specifications that relied heavily on asbestos. Demolition of decommissioned military facilities must address extensive asbestos contamination in insulation, floor tiles, roofing, and fire protection systems.
Military demolition projects often involve additional hazards beyond asbestos, including potential munitions contamination and restricted access. Asbestos surveys must be conducted alongside ordnance clearance, requiring specialist contractors with appropriate security clearances.
What You Need
Frequently Asked Questions
Does the military still use asbestos?
Most Western militaries have phased out asbestos use, but legacy ACMs remain in older military buildings, vehicles, ships, and aircraft. Personnel working in or maintaining pre-2000 military infrastructure may still encounter asbestos.
What if I was exposed to asbestos in the military?
Military personnel exposed to asbestos can claim compensation through the Armed Forces Compensation Scheme or civil litigation. Documentation of service locations and dates of potential exposure is essential for any claim.
How long does asbestos stay in the air after demolition?
Asbestos fibres can remain airborne for many hours after disturbance, depending on ventilation and particle size. Professional air monitoring is required after any demolition involving ACMs before the area can be reoccupied.
Find a Professional
Connect with verified asbestos professionals in your area who specialise in this type of work.
Search the Directory