Decommissioning a facility? Asbestos is typically present throughout.
Industrial plants, power stations, military bases, naval vessels, and large infrastructure facilities built before 2000 typically contain large quantities of asbestos throughout their structure, in thermal insulation, fire protection, gaskets, seals, and structural materials.
Decommissioning these facilities requires a comprehensive asbestos survey followed by a phased removal programme before general demolition can begin. The scale is often significant: a single industrial plant may contain hundreds of tonnes of asbestos-containing materials.
Decommissioning projects require specialised project management that coordinates asbestos removal with other hazardous material handling, structural engineering, and environmental remediation. The regulatory requirements are extensive and vary by jurisdiction.
The Problem
Military base decommissioning involves buildings and infrastructure built to stringent fireproofing standards that relied heavily on asbestos. Barracks, hangars, command centres, workshops, and ammunition stores all contain asbestos in insulation, flooring, roofing, and fire protection systems.
Military decommissioning projects face additional challenges: security restrictions, potential munitions contamination, and often remote locations. Asbestos surveys and removal must be coordinated with ordnance clearance and environmental remediation programmes, requiring contractors with appropriate security clearances and specialist capabilities.
What You Need
Frequently Asked Questions
Does the military still use asbestos?
Most Western militaries have phased out asbestos use, but legacy ACMs remain in older military buildings, vehicles, ships, and aircraft. Personnel working in or maintaining pre-2000 military infrastructure may still encounter asbestos.
What if I was exposed to asbestos in the military?
Military personnel exposed to asbestos can claim compensation through the Armed Forces Compensation Scheme or civil litigation. Documentation of service locations and dates of potential exposure is essential for any claim.
What asbestos surveys are required before decommissioning a facility?
A full demolition and refurbishment survey (invasive/destructive) is typically required before decommissioning. This goes beyond a standard management survey by accessing hidden areas behind walls, above ceilings, and within service ducts to locate all ACMs before dismantling begins.