Planning a demolition? Asbestos must be removed first.
Demolishing a building without first identifying and removing asbestos is illegal in virtually every jurisdiction. Demolition generates enormous volumes of dust and debris, and any asbestos present will be released into the environment, contaminating the site and surrounding areas.
A refurbishment and demolition survey (Type 3 / invasive survey) is required before any demolition work. This involves destructive inspection to access hidden materials behind walls, above ceilings, and below floors.
All identified asbestos must be removed by licensed contractors before demolition begins. The demolition permit typically requires proof that asbestos has been cleared from the site.
The Problem
Infrastructure demolition, water treatment plants, pumping stations, electrical substations, and utility buildings, involves structures that used asbestos extensively for thermal and electrical insulation. These facilities often contain both friable and non-friable asbestos in hard-to-access locations.
Demolition of infrastructure assets typically requires coordination with utility providers to ensure services are safely decommissioned before asbestos removal begins. Environmental permits often require air monitoring throughout the demolition process to protect surrounding communities.
What You Need
Frequently Asked Questions
What are the three main types of asbestos surveys?
HSG264 defines two main survey types: management surveys and refurbishment/demolition surveys. A re-inspection survey is also commonly conducted to update an existing management survey and reassess material condition.