Managing multiple buildings? You need an asbestos inventory and priority plan.
When you manage a portfolio of buildings, hospitals, schools, offices, public facilities, you cannot address asbestos one building at a time. You need a systematic inventory across all properties, a condition assessment for each identified material, and a prioritised management plan.
The inventory documents what materials are present, where they are, and what condition they are in. The management plan then determines: what needs immediate removal, what can be safely managed in place, and what schedule of monitoring and re-inspection is required.
This approach is both the legally required standard and the most cost-effective strategy. It avoids unnecessary removal of materials in good condition while ensuring that deteriorating materials are addressed before they become a health risk.
The Problem
Museums, galleries, archives, and cultural centres house irreplaceable collections that must be protected from contamination. Many cultural buildings date from periods of heavy asbestos use, with materials present in climate control systems, storage areas, and exhibition spaces.
An asbestos inventory in cultural facilities serves dual purposes: protecting people and protecting collections. Fibre release near artworks, documents, or artefacts can cause contamination that is extremely costly to remediate. Systematic management prevents both health and conservation emergencies.
What You Need
Frequently Asked Questions
What is an asbestos inventory?
An asbestos inventory is a systematic record of all asbestos-containing materials in a building or facility. It includes the location, type, quantity, condition, and risk assessment of each material. It forms the basis of the asbestos management plan.
Who needs an asbestos management plan?
Any organization responsible for maintaining a building that may contain asbestos needs a management plan. This includes building owners, facility managers, local authorities, housing associations, and healthcare trusts. The plan must be kept up to date and accessible to all relevant parties.
How is the condition of asbestos assessed?
Condition is assessed using standardized scoring systems that consider the type of asbestos, the product type (e.g., sprayed coating vs cement sheet), surface treatment, extent of damage or deterioration, and likelihood of disturbance. This produces a risk rating that guides management priorities.
How often should an asbestos inventory be updated?
Inventories should be reviewed annually and updated whenever materials are removed, repaired, or their condition changes. A full re-survey is typically recommended every 3-5 years. Any building works must trigger a review of the inventory before work begins.
Find a Professional
Connect with verified asbestos professionals in your area who specialise in this type of work.
Search the Directory